Liquid & paste
Viscous products Packaging Route
Viscosity context, temperature and clean cutoff.
Contact the engineering team
Look beyond a single viscosity value
A viscosity value alone cannot select the filling setup. Start with liquid-and-paste dosing principles, then assess temperature, holding time, stringing, cutoff and cleaning using the actual product. The overview introduces a method to investigate, not confirmed suitability for every paste.
Compare dosing methodsApplication review
Engineering questions this application route must answer
Translate product, pack and handling conditions into testable questions before moving into equipment scope. Use a representative sample and record both the test condition and every assumption that remains open.
- 01Viscosity window
At which temperatures and dwell conditions should product behavior be compared?
Application review - 02Cutoff requirement
What tailing, stringing, suck-back and seal-cleanliness result is acceptable?
Application review - 03Product supply
Does the route require heating, mixing, pressure, transfer or level-control inputs?
Application review - 04Cleanability
Which contact areas, residual pockets and changeover steps must the project inspect?
Application review

Choose the next step